+86-15190367399      lbm0715@163.com
You are here: Home » Products » High, Medium And Low Carbon Steel Wire Production Line » Wire Drawing Machine Manual Operation

Wire Drawing Machine Manual Operation

wire drawing machine needs maintenance for some months of running.
Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

The first Safety precautions

1. 1 Professional and technical personnel are required to carry out installation and commissioning. Before use, it is necessary to carefully read this manual and the relevant electrical instructions provided.

1. 2 Each machine and electric control cabinet shall be reliably grounded with a grounding resistance not more than 4Ω.

1. 3 There should be no accumulated water on the table top, especially near the operation box, as it can easily lead to circuit failure due to water infiltration.

1.4 It is prohibited for multiple people to operate the same equipment at the same time to avoid accidents.

1. 5 The electric control cabinet should be placed in a clean and dry room, and the door should be closed when working to prevent dust intrusion from causing device performance degradation or failure. Air conditioning is used to maintain the ambient temperature of the electric control cabinet. Frequently check the operation of the cooling fan on the top of the electric control cabinet.

1. 6 Before starting the machine, check whether the safety device is normal.


2. 1. Check whether the equipment is damaged and complete upon delivery (according to the packing list). If there is any damage or inconsistency with the contract, please contact the dealer or manufacturer immediately.

2. 2 The manufacturer is only responsible for quality issues arising during production, and is not responsible for damage caused during unpacking, improper installation and use, or damage caused by overload operation.

2. 3 After unpacking, the accompanying documents should be properly kept, as they are necessary during equipment installation, commissioning, and use.mc

The third technical indicators

3.1 main technical indicators

Order

Name

Unit

Parameter

1

Total equipment power

KW

208KW

2

1# ~#8

KW

8×22KW AC variable frequency motor

3

Sand belt machine power

KW

2×7.5KW AC variable frequency motor

4

Take up machine

KW

11KW

5

Speed regulation


Frequency conversion and speed regulation of frequency converter

6

Control type


PLC control

7

Brake time


Normal 30 S EMG 5S


Previous: 
Next: 
Call Us Now
+86-15190367399
Address
No 40 Xinhua Road, Xinqiao town, Jiangyin city, Jiangsu China
Jiangyin Wanyi Mechanics Technology Co., Ltd.
Subscribe Now
Incorrect Postcode Submit
Copyright © Jiangyin Wanyi Mechanics Technology Co., Ltd. All rights reserved.
Follow Us